Pipeline Failures
- Failure of the Olympic gasoline pipeline. Provided forensic engineering
services to determine the cause of the failure. Prepared expert testimony
and a written report. The case was settled out of court.
- Failure of a rural pipeline in South Dakota. Provided forensic engineering
services to determine the cause of the pipe failure. Prepared several
expert reports, affidavits and gave two depositions. Spent 6 weeks in
court evaluating testimony of opposing experts and testifying for the
defense. Case settled in court.
- Failure of a penstock to a hydro power plant in Idaho. Provided forensic
engineering services to determine the cause of the failure. Prepared
expert report and gave deposition. The case settled before it went to
trial.
- Failure of a 78 inch diameter concrete pipe for Stockton CA, East
Water District . Provided forensic engineering services to determine
the cause of the failure. The case was settled out of court.
- Failure of a large diameter pipeline in Puerto Rico. Provided forensic
engineering services to determine the cause of the failure.
|
|
 |
|